Riverview Meadows

Compare

What is the difference between a lot loan and a construction loan?

At Riverview Meadows, the difference between a lot loan and a construction loan is what each one pays for: a lot loan pays only for the land, a construction loan pays for the build in draws, and a construction-to-permanent loan rolls both into one loan that becomes your mortgage; buying a finished house skips the build. Which one fits comes down to when you want to build, and here that clock starts when your lot closes, after the county records the final plat, which is the official map of the lots.

Last updated: 2026-10-19

The figures on this page are general market ranges from the sources named beside them. They aren't the terms our lending partner offers, and none of them is a rate.

Side by side

Lot loanConstruction loan (standalone)Construction-to-permanent
What it pays forThe land only.The build, paid out in draws as each stage is finished.The lot and the build in one loan, which becomes a standard mortgage when the house is done.
Down payment35% for raw land, 25% for unimproved land, 15% for improved land, per FDIC guidance.The sources we read give no separate figure.At least 20% of the total project cost, sometimes up to 30%.
CreditMinimums run from the upper 600s to the lower 700s.The sources we read give no separate figure.A credit score of 670 or higher and a debt-to-income ratio of 43% or lower.
Payments during the buildYou aren't building yet. You pay on the land.Paid out in draws.Interest-only, on the money drawn so far.
ClosingsOne for the lot, then a second loan when you build.One for the build. It "must be paid off or refinanced after construction."One.
TermGenerally 5 to 30 years. An older source puts the top end at about 20 years.It ends when the build does.A construction phase of 12 to 18 months, then a standard mortgage.
What the lender needsNot covered in the sources we read.Plans and a builder before the first draw.Detailed plans, and a review of the builder's license, insurance, references, finances, contract and budget. The appraisal is on the finished house as planned.
If the build runs lateDoesn't apply yet.You still have to pay it off or refinance when it ends.An extension fee, and you may have to qualify again.
What switching costsA second loan later, with a second set of costs.Paying it off or refinancing into a mortgage, with its own closing.Nothing to switch. It converts on its own.

Buying a house that's already built

Regular mortgage on a finished house
What it pays forA house that is already there.
Down paymentAs little as 3.5% with FHA, and as little as 5% on a conventional loan.
Payments during a buildNone. There is no build.
ClosingsOne.
What you give upChoosing the plan.

Sources, all read 2026-10-19:

The real limits

  • A lot loan now means another loan later. When you're ready to build, you take out a construction loan and pay a second set of costs.
  • A construction loan wants the house figured out first. Plans and a builder come before the first draw, and the lender reviews the builder's finances as well as yours.
  • Builds run late. On a construction-to-permanent loan, a late build can bring an extension fee and a second round of qualifying.
  • A finished house skips all of it. You also don't choose the plan.

Some costs land on the build side no matter which loan you pick. Sewer is $4,258 per home to connect, plus a $20 permit and a $54 inspection, then $30 a month billed quarterly. Water was about $6,678 per home in 2025. Building costs depend on your plan, your lot and your builder, and we don't publish a build price.

Which fits your timing

A construction-to-permanent loan, if:

  • You want to start building soon after the lot closes.
  • You'd rather sign once than close twice.
  • You already have a plan in mind, or a builder you trust.

A lot loan, if:

  • The house is a few years off.
  • You want to hold the lot while you save up or sell your current home.
  • You're fine taking out a second loan when the build starts.

A regular mortgage on a finished house, if:

  • You have no interest in building.
  • You want to move in without waiting on a build.
  • You're happy living in someone else's floor plan.

The steps, in Riverview's order

  1. Visit and pick a lot. Every lot is $145,000 for the first 10 to close. That price is only guaranteed for the first ten.
  2. Talk to a lender before you choose a plan, so the loan matches when you want to build.
  3. Price your plan with a builder. You bring your own plans and builder.
  4. Reserve the lot. Closing comes after the county records the final plat. The county approved the preliminary plat on June 11, 2026.
  5. Get permits through Tillamook County.

The lenders

Riverview Meadows works with The Lindley Team at Movement Mortgage, David Chandler and Brianna Lindley. You can also use your own lender. Their full program list is on the financing page, and there is more on building a new home on their site. The Lindley Team: (971) 754-1771.

Talk to the lenders before you pick a plan. If you'd rather see the lots first, book a visit with the brokers at (503) 730-8677.

Movement Mortgage, LLC — NMLS #39179. David Chandler NMLS #265974. Brianna Lindley NMLS #1367416. Equal Housing Lender. This is not a commitment to lend or extend credit. All loans subject to credit approval; rates, programs, and terms are subject to change without notice. The Lindley Team at Movement Mortgage is an independent lending partner referenced with permission; Riverview Meadows is not a lender.

Brokered by The HouseLab Team at Like Kind Realty.

Brokered byThe HouseLab Team

Talk to Jake or Tony.

Riverview Meadows is brokered by The HouseLab Team at Like Kind Realty. Jake and Tony handle the lots themselves: availability, pricing, reservations, and the questions that come up before you build. You talk to a person who knows this project.

Jake Goodson

Jake Goodson

Broker · The HouseLab Team

Tony Le

Tony Le

Broker · The HouseLab Team